A tired hall bathroom taken back to studs and rebuilt with new tile, vanity and fixtures.
After · Bathroom Remodel — Full Gut
Before · Original space
The transformation
Rebuilding from the studs
A tired hall bathroom taken back to studs and rebuilt with new tile, vanity and fixtures.
What to consider for your home
Removing the existing finishes allows underlying conditions to be evaluated. Decide what is included in the base scope and how newly discovered repairs will be priced before demolition begins.
The photos show the finished design, not concealed construction details. Your scope and estimate depend on the conditions and selections in your own home.